Change Production Features

Written by Concircle | Aug 11, 2025 4:07:11 PM

Process

Production Change involves multiple steps as shown on the flow chart below. Our How-to focuses on the plugin „Change Production“ which was delivered in the WorkCenter PODs with the November/December 2024 SAP Digital Manufacturing release.

There are multiple technical prerequisities that need to be checked and considered before the start: If you are not familiar with these, don’t hesitate to contact us at hello@concircle.com.

 

Configuration

 
 
This “How to” is intended for general information purposes only. Circumstances may change and the asset become outdated as a result. We do not guarantee the accuracy of the statement.