concircle blog

Machine and Plant Engineering: Integrated PS and PP Planning in SAP with conOS

Written by Farhang Akhavei | Nov 27, 2026, 2:53:09 PM

Bringing project and production planning together in SAP for machine and plant engineering

 

Why make-to-order manufacturing needs more than a view of a single project

In machine and plant engineering, hardly any machine comes off the shelf. Customers configure their systems, and every order runs through its own phases: engineering, procurement, assembly, delivery and commissioning. In SAP, the Project System (PS) maps these phases as a project, while production orders and machine capacities sit in Production Planning (PP).

 

The real challenge lies between the projects. Several orders draw on the same design engineers, assembly technicians and machines at the same time. When an engineering activity slips, it affects procurement and production, often in other projects. If you plan PS and PP separately, you only see these conflicts once they are already costing you deadlines.

 

Many companies therefore fall back on planning tools outside SAP or on Excel. That creates new problems: interfaces have to be maintained, data drifts apart, and planners work with different versions of the truth. As a consultancy specializing in machine and plant engineering, we see this situation regularly.

 

A solid foundation: the engineer-to-order process in standard SAP

For make-to-order manufacturing (engineer-to-order, ETO), SAP offers an end-to-end process across sales, the Project System, Materials Management and production. Set up correctly, every customer project is created from the same master data.

 

From configured sales order to project structure

The basis is a configurable material with a super BOM, a super routing, classes and dependencies. Add a standard project and a configurable standard network. When sales staff create the sales order in SAP SD, the configuration determines which items, WBS elements (work breakdown structure) and network activities are created. Phases such as engineering, procurement, assembly and delivery are therefore built into the project from the start.

 

Requirements for Materials Management and production

Materials with requirement dates are assigned to the network activities. Requirements planning uses them to generate planned orders, purchase requisitions and purchase orders in Materials Management (MM), as well as production orders in PP. Costs flow to the WBS element through account assignment. In this way, sales, project, purchasing and production are connected at the data level.

 

Where the standard reaches its limits

The data is connected, but planning often remains separate. Project managers plan activities in the project, while production planners plan operations in PP. The standard lacks a shared, graphical view of all projects and production, with the real availability of people and machines. This is exactly where our add-on conOS comes in.

 

conOS: project and production on one planning board

conOperationScheduling (conOS) is an add-on fully embedded in SAP for capacity-based planning on a graphical planning board. conOS works directly on the SAP data, so there is no second data store and no interface to maintain.

 

All project levels in one view

conOS plans entire projects down to the level of WBS elements, networks, activities and activity elements. Planners see all running projects at the same time and can tell where orders compete for the same resources.

 

Real availability from SAP HR and PP

conOS reads employees’ shift schedules from SAP HR and takes vacations and absences from the relevant infotypes into account. At the same time, machine availability comes from PP. Engineering activities in the project and operations of the production orders therefore sit on one shared planning board. Planning is finite, so activities from different projects do not overlap.

 

Flexible fine planning

Activities can be split and distributed across other capacities, divided evenly, extended or shortened. Work, duration and scheduling position of individual splits can be adjusted directly. If the situation changes, planners merge or delete splits.

 

Deadline constraints in view

conOS shows the specified start and end dates of an activity as red lines on the planning board. Activities with date conflicts are highlighted in color. This keeps the sequence within the project intact, even when planners reschedule at short notice.

 

Personnel scheduling with conPEP

For production, our add-on conPEP extends planning with integrated personnel scheduling. conPEP is based on standard SAP capacities and is connected to SAP PP/DS (Production Planning and Detailed Scheduling). Planners can see exactly when employees are available and schedule orders accordingly.

 

 

In practice: integrated planning at an international machine tool manufacturer

An internationally operating machine tool manufacturer had so far planned its customer projects in a tool outside SAP. The interface caused constant problems, planning data and SAP data were out of sync, and transactions in sales and the Project System were slow.

 

Together with the company, we replaced the external tool with conOS and optimized the existing processes in SD and PS. In a second step, conPEP was added for personnel scheduling in production. We worked in a hybrid way, with agile and classic elements, and gathered requirements in on-site workshops with the business departments.

 

Since 2026, two plants have been planning with the solution. Interface maintenance is no longer needed, the data is in sync across the entire SAP landscape, and planning takes noticeably less effort. The rollout to another European plant is underway. The next step is to connect conPEP to SAP SuccessFactors so that HR data flows into planning automatically.

 

Key takeaways

  • The ETO process in standard SAP connects sales, project, purchasing and production at the data level. External planning tools can break this connection again.
  • Bringing project and production planning together on one planning board makes it possible to spot capacity conflicts between projects early.
  • Real availability from SAP HR, PP and PP/DS makes planning reliable, because it is based on the same data as execution.

 

As a specialist in machine and plant engineering, we support you from the analysis of your ETO process to the introduction of conOS and conPEP. Get in touch – we will show you what integrated planning can look like in your SAP landscape.